Grúas y Equipos García performed the unloading and assembly of pipes for the wastewater inlet and outlet network of the El Ahogado Plant, in the state of Jalisco.

For this same plant, the movement of falsework for the casting of the storage tanks and the unloading, assembly and transfer of electromechanical equipment was also performed.

Due to the diverse nature of the work, several cranes of different capacities ranging from 2 to 250 tons were used.

The duration of the entire project was approximately 2 years and the company for whom this work was developed was Atlatec.

The objective of wastewater treatment is to produce an influent that can be reused in the environment and a solid residue or sludge (biosolid or sludge) useful for reuse.

We have the service of unloading and assembly of pipelines with highly trained personnel and certified cranes for total safety, punctuality and precision in this type of projects.