Details

At La Perla Districta work with a sustainable infrastructure and a project of the highest quality, Grúas y Equipos García collaborated with the maneuvering and placement of 3 chiller maneuver of placing 3 chiller weighing 9 tons each, to lift them to a height of 26 m.

A 220-ton Grove GMK5220 crane, with a 63 m hydraulic boom configuration , 31-ton counterweights, 20 m working radius and a 16-ton load capacity, was required for the execution of the project.

To place the chillers in their final position, they traveled a distance of 60 m using a 2.5 ton Linde H25Dforklift, turtles, hydraulic and ladder jacks, as well as trained personnel to perform the maneuver on the floor and to install the chillers on their bases, which were 1.20 m high.

All these tools and work techniques are carried out working together in each maneuver, and satisfactorily covering the needs required by each of our customers.

Grúas y Equipos Garcia is making inroads with equipment and personnel trained in special maneuvers.

DO YOU NEED A CRANE MANEUVER?

Contact us and shortly we will respond to your service request.
At Grúas y Equipos García we are here to serve you.